At the request of the Vice-Rector for Development and Investment, the General Administration of Projects, Operation and Maintenance to renovate the University Camp in preparation for the the winter season.
The guest and dining halls were rearranged along with the outdoor space. A path was set for cars and the camp was decorated with trees and flowers. Interlocking floors were installed along with lighting poles and signs boards for the buildings.
Last modified
Thursday, 04/January/2024