The Administration conducts maintenance work on the main campus well

The Projects, Operations and Maintenance Department, represented by the Infrastructure and Stations Department, carried out comprehensive maintenance works to improve the performance of the well.

Fans and pipes of the well were replaced to ensure their efficiency in pumping water and cooling the engines. A maintenance was also made to the oil cooler responsible for maintaining the optimal operating temperature. The power cable was checked to ensure effective flow of electricity, and the specialized teams tested the engine carefully to ensure its readiness and efficiency in daily operations.

These works come within the framework of periodic maintenance plans aimed at enhancing the safety and sustainability of equipment and ensuring the continuity of operations without interruption.

Last modified
Monday, 18/November/2024