The Administration carries out maintenance works in preparation for rainwater

عزل

As part of regular maintenance work in some university buildings, the Administration fixed leaks in preparation for rainwater.

Damaged insulation materials were replaced with new ones using foam and insulating paint in the building of the College of Sciences and Humanities in Hawtat Sudair for the male campus with an area of (389 square meters) and the female campus with an area of (670 square meters), the astronomical observatory building in with an area of ( 820 meters), and the ceremony hall in the university administration building in with an area of (416 meters).

Last modified
Wednesday, 20/December/2023